Author Topic: Grrr sleepers....  (Read 6156 times)

0 Members and 1 Guest are viewing this topic.

Offline cabbage

Re: Grrr sleepers....
« Reply #60 on: Oct 31 2020 12:52 »
Having survived the week long hangover that is "changing the clocks" I think my system is back in tune with itself. Trying to solder when all you want to do is fall asleep is slight dangerous(!) I have got some of thw route lights connected but the problem is now down to the seven Vregs that produce the 3Volt lines to each battery of LEDs  on the mimic board.

The blue LEDs light at 2.6V the white ones at 2.8V. because the number of blue and white LEDS is different for each route the draw on each Vreg the brightness varies(!) This means twiddle and tweak on the multiple turn pots on each Vreg. (ugh!)

Still there is nothing else to do but watch the rain...

Regards

Ralph

Offline John Branch

Re: Grrr sleepers....
« Reply #61 on: Oct 31 2020 17:04 »
Ralph,
I have been following the CPR track relaying and signalling saga with some interest and a lot of admiration for fortitude in the face of  adverse metrological and other conditions. It was like one of those TV programmes where the narrator says "but will the signals light on the get together day?".  OK, the gtg has come and gone-any pics?
Best,
John

Offline cabbage

Re: Grrr sleepers....
« Reply #62 on: Jan 23 2021 15:40 »
Well after a massive cascade Vreg failure which removed all the working LEDs from the mimic board. I am pleased to announce that next week should see the completion of the board and I can concentrate on the external connectors -all ninety six of them....

regards

ralph

Offline cabbage

Re: Grrr sleepers....
« Reply #63 on: Jan 28 2021 12:10 »
After having to take a few days off the building of the mimic board because it fealt like my eyes were bleeding from the effort of trying to read 1/4w resistors...

I have been programming some new parts for the railway. I am going to construct a false OHL system based on British and Swiss methods. The straights are British and the curves are Swiss.

This is because the UK method of turning a corner would not survive even a moderate breeze here. The "visual aspect" is of a 1922 Pierson Report 1500V and 660V DC traction however none of it will work!!!

There will be a "Rotator house" to convert the AC to DC and supply it to the OHL and 3rd rail. I have been given a xerox of a genuine rotator and switch garden from Blackburn Starling - which I will attempt to use(!) The electrics as such will be from blue LEDs, which will flicker and flash.

And yes... The Rotator will have the makers plate:

ANGUS YOUNG &CO.

Regards

Ralph

Offline cabbage

Re: Grrr sleepers....
« Reply #64 on: Jan 28 2021 15:04 »
Ok before the eyes go again... Here is the mimic board showing route one. White LEDs are outward and Blue LEDs are return.





I now await the next delivery of LED holders...

Regards

Ralph

Offline cabbage

Re: Grrr sleepers....
« Reply #65 on: Mar 10 2021 09:55 »
Yesterday "The Apprentice and I" completed the first stage of power switching. The routes 1-7 now self isolate and power the points to be open or closed. We didn't have that much time for testing having to make and disconnect 48 screw barriers takes time(!)

The next stage will be to wire in the quick connect Molex unions. These Molex are 12 way ex IBM from the 1990's. These come from the time when "Molex connectors were real Molex connectors!"

As in all things you have to design for expansion, so there is room for route 8 thereafter I can do nothing....

Some people have noted the seemingly strange array that are the route setting switches. Think of it like this:

1-1-1-1-1
1-0-0-0-0
1-8-8-8-8

Only the last four digits are changable. If you select route 1  the number generated is 10001 route 2 generates 11001 but route three generates18000. The 8 in the number tells the system that it is a return route so it lights the blue leds.

This is about all I can do until after the storms... Then it will floundering in the mud connecting up the "local" signalling system.

Regards

Ralph

Offline AshleyW

Re: Grrr sleepers....
« Reply #66 on: Mar 10 2021 10:01 »
had you also modified the point rodding from the motors ? i recall that was on the to do list ?

Offline cabbage

Re: Grrr sleepers....
« Reply #67 on: Mar 10 2021 11:14 »
We have done six of the eleven link rods. At the moment the house is shaking under the gale blasts and the rain is moving sideways across the windowpanes.

I have to go out and get my Covid #2 vaccination...

Regards

Ralph

Offline cabbage

Re: Grrr sleepers....
« Reply #68 on: Mar 20 2021 13:15 »
The system is now at the point(!) where the sign Danger Engineers Testing is raised... The test cables have been removed and the permanent cables, made of "trailer cable" have been spliced in and the 24way ex IBM Molex connectors fitted.

Now we are ready to run a test loco over the trackwork sometime next week. This will probably be "No.5" as she is my most docile of locos and then with "Maude" who most definitely isn't.

Regards

Ralph