• Welcome to The Forum for Gauge 3 Model Trains.
 
The Gauge 3 Society       2.1/2 inch Gauge Association       Cookies and privacy HOW TO JOIN: to request forum membership please click here

Gauge 3 Society members must be logged in to view the Society section
  G3 Clubroom

Welcome to the G3 Clubroom. This is the friendly online forum where members share ideas and inspiration, suggestions and advice, modelling tips, pictures and drawings, and general chat about our fine hobby of Gauge 3 railway modelling. A warm welcome, and enjoy your visit here today.

Grinding halt with regulator open & safety valve lifting.

Started by 454, Jun 02 2013 17:44

« previous - next »

0 Members and 0 Guests are viewing this topic.

454

Pirate Ian,

There is a strong chance if things go ok this week that Brit will stay at home for a rest a while & that I will bring along something different to grace the steaming bays of Ampthill.

Kinder Scout will however make an appearance only if it survives the rigours of Blackgang operation at Llanfair Caereinion on it's next scheduled outing.

Dave
Promoter of equal rights for steam, diesel & non-insulated axle electrics.

454

After failing to attend Ampthill , the next steaming day was Thurnby, a glorious sunny day with other models taking turns & enjoying the fine weather.

Morning run of my Brit. Steam up No.41 went perfectly. 40 mins duration.
Afternoon run. Steam up No. 42 also went perfectly. 40 mins duration.

Both runs were achieve with 80% forward running & 20% reverse running.

Load was at times 4, 5 or 6 of Trevor's Gresley Teaks.

Thank you Trevor for your hospitality.

Next opportunity is Timperley in October.

Dave
454



454

Great day out at Timperley today. Sadly not well attended but took advantage of running Kinder Scout which performed to satisfaction in advance of preparing the Brit for the track.

Britannia was steamed for the 43rd time & performed impeccably. The first charge of gas ran out after 40 minutes so the loco was run under remaining low pressure light engine to the station area where a recharge of gas & fresh lubricator oil was performed & fire re-lit. The loco was re-coupled to the freight consist & a further 30 minutes of running was achieved. As the loco was not allowed to cool down I regarded this as the same steam up.

The Brit this time was manually operated as I am not prepared to fit R/C to the loco in inclement conditions to protect the servo & electronics from dampness as my kit is not waterproof.

Total time in steam at Timperley was approx 1 hour 10 mins.

Making a total accumulated logged running time of 26hours & 38 mins

If this is as good as a Kingscale product gets then I cannot wait to get my dirty hands on the
BR(W) ex GWR 14XX 0-4-2T in black for the start of the 2015 GTG season.

Dave
454



AllWight

Hi Dave

I think your 14XX should be as the one in the Titfield Thunderbolt film. No need for track just watch out for those trees!!!. It would look good with your wisbech tram coach a cattle wagon and a toad brake van. Stanley Holloway eat your heart out!!

I would have been up at Timperley but the lure of a quiet day at moors valley railway appealed more. I was meant to have a workshop day but ended up driving Zeus our big african 2-6-2 t vanderbilt tender loco.
This is not radio controlled but but is infact DTC (DIRECTLY TEA CONTROLLED). Going on yesterdays performances Zeus appears to steam on a twig and a leaf. Spent all the time trying to shut it up.

Glad you had a good day with britannia i think you need to do some time trials now and think about fitting a working waterscoop as well as troughs to really create an interesing scenario and soak every gauge 3 member within a 3' radius.

Mark

blagdon

Dave

Well done to old 'Britannia'; I agree with Mark about running a 'Titfield Thunderbolt' train, Cliff Daniels 'Spam Can' present would make things even better!

Having found out how to edit my Camcorder clips, I would love to make a short 'Movie at GTG's.

Ian the Gauge '3' Pirate

454

Thanks for that Ian.

Here I was content in thinking that a 14xx plus auto coach would be a delight to run at a GTG. Now I am not so sure.
The 14xx plus GW Toad & W&U coach are just languishing the stock yard awaiting to be rostered. Maybe that is the way to go. What a good suggestion & no more additional rolling stock is needed to make it all happen. The irony is my Panda has been swapped & a hatchback with more space has been purchased so now I have even more redundant space, probably should have bought a Smart car instead.

Cheers
Dave
454


AllWight

Thats great news Dave. Have you considered the head to head with the 14xx and the Wallace & Stephens steam roller!!

To quote the film, "its safer by road"

Mark

454

Mark

I don't think the Mamod steam roller would qualify for Gauge 3 but boiler testing at Ampthill in March 2015 would be a real scream.

Dave
454

AllWight

Gentlemen stand by your engines!!! Get ready to run like the winf

blagdon

Dave & Mark,
I'll just bring the Camcorder and could bring a cattle wagon; currently have LMS Ex-Nor'Western one and hope soon to start on (Walsall) Swindon one.

Thinking about steam roller (not for 'battle' though), do you know of any kits in our scale for rollers or traction engines as they would make good load for implement wagons.

Ian the Gauge '3' Pirate road

454

Quote from: 454 on Oct 20 2014 00:17

Britannia was steamed for the 43rd time & performed impeccably.
Making a total accumulated logged running time of 26hours & 38 mins


Hi Y'all,

Just a note to draw a line under the start of the new running season & end of old running season.
The 43rd steaming & logged running time of 26 hours & 38 minutes is likely to put a dent in Britannia usage subject  to re-scrutiny.
Why?
Boiler rules!!!!!

Thankfully with the backing of Kingscale a retro fit modification to the loco will be needed as other operational Brits will need the same. The fitment of a water gauge blowdown valve will enable regulations to be met & once we are set up we can pass the loco out onto the GTG circuit & get on with clocking up steaming time.

This will be a brilliant modification & will enhance the Brit's boiler water level viewing.

There will be implications though as the boiler testing will need to be reset as the modifications will need to be recorded & performed according to the Southern Fed Regs.

Hope fellow Southern Fedn Brit owners will understand these implications & not be too disappointed to succumb to the regs & be patient whilst our mods are being incorporated.

Watch this space as we stay updated........

Cheers
Dave
454



John Candy

Do I take this to mean that the locos were designed, constructed and have been operated IN BREACH of the regulations?

Alternative is that the SF has recently changed the regs.
If latter, does that indicate that their regs. themselves were in breach of the statutory Pressure Vessel testing requirements?

If the statutory requirements have not changed and have themselves not been breached, then this smacks of more "over-regulation" in the same category as the 3 bar-litre and another potential deterrent to live steam in the G3 environment.

What exactly has changed?

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

IanT

Nothing has changed John, the Brit is >3bl.

If you look at the MELG 2008 guidance (I downloaded my copy from the 16mm group if anyone wants one btw) para 10.3 states;  "The water gauge(s) shall be blown down and the water levels shall be seen to recover without delay"

Essentially the same as the new 2012 'Greenbook'  (see para 11.6b) which further references top & bottom water level gauge valves.

Regards,

IanT
Nothing's ever Easy - At least the first time around.

454

John,

Calm down John don't make a drama out of a regulation.
We are attempting to make our locos operate properly, throwing a legalistic wobbler is not helpful thank you!

We are also intending to be constructive & sensible with retro fit mods that will be expertly fitted.

Dave
454 Steam now issuing from between ears.

John Candy

Dave,
I was just asking a perfectly reasonable question...... why is a blow down valve required now, when it was obviously not necessary to have one in order to obtain a safety certificate on previous occasions?

I realised that the Brit is >3B-L but merely asked why (if the statutory regs. had not changed) is it now deemed necessary to introduce another requirement, likening it to the (superfluous to statute) 3B-L requirement.

John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.