Cambridgeshire Progress Report

Started by John Candy, Jun 22 2013 11:07

« previous - next »

0 Members and 0 Guests are viewing this topic.

John Candy

The past week of wet weather resulted in the majority of time being spent on turnout construction, with another 8 Cliff Barker style turnouts being produced.

Of these, 6 went on the laying of the high level branch line terminus.

The photos have been taken from both ends of the station, which consists of a long platform road, with run-round loop and three sidings (one of which is a short 6ft. siding, running off the loop to serve a loading ramp and cattle dock).

The platform road has a "John Witts" rail-built buffer stop with red cross beam (just visible in the photos.) while the two long goods sidings have the sleeper-type stops cast in resin.

The short "dock" road will terminate with an end-loading bay, with buffer stops built into the platform.



First photo shows approach to terminus from the south end of the viaduct, with the double-track mainline passing beneath and the line descending from the viaduct to the junction station.





My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

Geoff Nicholls

John,
aplogies if this has already been raised and answered, how are you planning to control all those turnouts? Or more specifically, as I've just bought two, what do people use as point levers for Cliff Barker turnouts?



Geoff.

John Candy

Geoff,

All my "running" line pointwork will be controlled by a mixture of pneumatic (Sunset Valley) and electrical (LGB) motors (currently have a stock of 20 pneumatic and 11 LGB).

"Yard" pointwork (i.e. anything which does not give access to the running lines) will be manual and I have 7 Cliff Barker lever kits. Mike also now makes lever kits and, if I had not previously bought from Cliff, I would probably have bought Mike's which are of a more "modern" style.

Of the trackwork in the above photo, all but one will be electrically controlled (the run-round loop is treated as part of the running line and under control of the signal box).

John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

John Candy

Yes, we have no bananas...! (for those who remember the plastic post problems I experienced last year).

Remember those plastic posts from last Summer.......the ones that were to have carried the high-level line across the lawn?
They went banana-shaped when the full heat of the mid-day Sun caused them to expand unevenly.

Well, they have just been installed in the most shaded part of the garden (where the Sun cannot cause them to bend) and, hopefully, will stay straight and upright.
They are to support the principal terminus of the line and have been concreted into the ground, following a day spent by my builder, drilling the 21 post holes with a motorised auger.



Above : View from site of MPD towards terminus (the heap of paving slabs is waiting to be re-laid in the shallow trench to the right).



Above : View from the opposite (buffer stop) end.

The 4x2 timber to provide the trackbed support is in stock and (weather permitting) will be installed this week.
The plastic board will be ordered from Filcris on Tuesday.

---------------------------------------------------------------------------------

Other work over the past week has seen the entire Powdermill branch trackbed laid (usual formula of poured concrete footings, surmounted by dense concrete blocks, then two inch thick timber beams, topped off with my favourite recycled plastic board).






Above : The trackbed construction in progress at the end of the branch.









Above : Tracing the line towards Powdermill Junction.



Above : Powdermill Junction has already been laid in (Powdermill Branch forks to the right, while the track to the mainline junction veers to the left).

Track for the entire branch is currently on order from Cliff.

A visit to the Enfield Powdermill last year gave me the idea that a remote (from the mainline) location would be the place for a (gun)powder mill.
Decision to be made : Should I lay a Royal Ordnance Factory 2ft 6ins gauge (32mm) line from the standard gauge sidings, disappearing into the undergrowth towards the Powdermill site? It would require an industrial petrol/paraffin/diesel loco plus a few WD-type wagons to convey explosives and munitions materials to/from the interchange siding. Peco make suitable 32mm track/turnouts and wagon turntables.
Will also provide an excuse for gunpowder vans to appear in my G3 goods trains!

John
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

454

John,
As an idea you could model a massive crater in close proximity where the developers of the explosives & detonators got it wrong & install a bit of twisted track which got wrecked to amuse unwary visitors. By the way did you know that a Y6 worked at an ordnance factory for a while at Burton on Trent? You might know more than me about that so your Y6's will be ideal for the branch.

Cheers
Dave


John Candy

#80
Dave,

Yes, I knew Y6's were sent to Ordnance depots around 1944 but frequently derailed.
As for a crater... at the moment there is a giant heap of spoil (from the excavations for the branch) adjacent to the terminus.

I was thinking this could be the blast shield around the site and could be provided with underground stores served by 32mm tracks running from wagon turntables, with the main 32mm track disappearing around the back, perhaps via a tunnel.

John.

P.S.  Having looked up details to refresh failing memory, it was the same Y6 (No.7134) which served at two ordnance sites : Firstly with the US Army at Burton-on-Trent, then at a W.D. site near Sinfin.

Two also served at Wissington (Norfolk) which was where the derailment problems occurred.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

John Candy

I am surprised to see it is 3 weeks since I last posted a report.

Since then, the trackbed for the principal terminus has been completed and, most recently, an extension to the Powder Mill branch has been started.
Another Filcris order will be placed tomorrow, together with another order for Cliff Barker later in the week, when I have calculated the quantities required.

I had thought I had finished Powder Mill branch but, when I came to lay out the trackwork, found I could not fit it all in. So, more shrubbery and trees were cut back and the branch extended by another 28 feet to a new terminus, close to the junction station but at a higher level. The terminus will be a simple tramway style (low) platform with a run-round loop plus a siding for the spare tramcars (Wisbech & Upwell style). Goods trains for the Powder Mill sidings will shunt the sidings when running up the branch (towards the terminus), then the newly formed goods train will proceed to the terminus for the loco to run-round before proceeding back to Powdermill Junction. There will also be a tram halt at the Powder Mill.

Below : Substructure of new Powder Mill branch terminus (to the right can be seen the step up to the bridge over the junction tracks).




Substructure of main terminus, with timber bearers bolted to plastic posts.





Terminus area with plastic board in situ.





Not yet decided what to do about a 2ft 6ins gauge (32mm) ordnance factory line.

As soon as my three (contracted out) turnouts arrive, I shall be able to complete the three main running circuits and start test-running.

Pigeons are proving to be a (messy) nuisance at a couple of locations, so may have to arrange a pigeon shoot!

John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

MikeWilliams

Looks awesome John.  Look forward to visiting and having a run.

As for "may have to arrange a pigeon shoot" would a track-cleaning wagon be a serious benefit?

Mike

John Candy



Mike,

I am afraid the pigeon mess is more a job for the pressure washer than a track cleaning wagon!

Progress Update : This morning phoned Filcris and arranged to collect board to complete the Powder Mill branch extension.
Afternoon spent trimming and fitting to sub-frame.

Photos show board in situ with some pointwork laid out to check "fit".
Need to assemble one more turnout for the run-round loop and then cut the plain track to fit.







The extension starts where the board crosses the path to the shed and (fortunately) the path was at exactly the same level as the sub-frames either side, which avoided some messy work with the angle grinder.



The board area covered with leaves and pigeon mess (you can see the extent of the problem) is the original terminus of the branch.



My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

454

Cannot wait to send Kinder Scout around the circuit John.

Kinder Scout's travels are: Ralph's, Timperley, Thurnby, Wootton, Ampthill, Reading, Blackgang/Chalfont & even Rugby ME track.

Heaven knows how many total miles it has travelled on track & in the boot of Panda G3 support vehicle.

Still have a few gardens to go to complete the set.

Cheers
Dave

Jon Nazareth

John

The grey boarding that you use.  Can you tell me what sort of span it can take without bending and the availability?

Jon

John Candy

Jon,

The board is 19mm thick "Eco Hoarding Board" (EHB) and is available from Filcris at Bourn Airfield, near Cambridge.

It costs approx 90 GBP for sheet 8ft x 4ft but the delivery charge is 25 per sheet (I live only 12 miles away so collect it).

It needs supporting in the same way that you would support plywood of the same thickness, as you will see from the photos. of my construction methods.

I would certainly not suspend a narrow strip from its ends for more than a few inches.

If you want technical help, phone Chris 01954  718327 (the company is owned by Chris and Phil... hence the name) and explain you need it for a garden railway and mention that you are interested in using the same type of board as John Candy.... he will probably send you a sample.

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

AllWight

Do what the airports do to get rid of birds and use a hawk that will soon scare them off!!

454

It's to be hoped Hawk droppings are less obnoxious & fewer in quantity than the pigeon variety.

Dave
454

John Candy

We do have a Sparrow Hawk which "does the rounds" and comes to us a couple of times a year.

It does polish off a few pigeons and doves and leaves heaps of feathers around the garden....plus the occasional severed head!

It dives down from height and snatches the pigeons from the branches, then wrestles with them on the lawn.....the pigeon sometimes manages to escape.

John.