• Welcome to The Forum for Gauge 3 Model Trains.
 
The Gauge 3 Society       2.1/2 inch Gauge Association       Cookies and privacy HOW TO JOIN: to request forum membership please click here

Gauge 3 Society members must be logged in to view the Society section
  G3 Clubroom

Welcome to the G3 Clubroom. This is the friendly online forum where members share ideas and inspiration, suggestions and advice, modelling tips, pictures and drawings, and general chat about our fine hobby of Gauge 3 railway modelling. A warm welcome, and enjoy your visit here today.

Gauge 3 Exhibition Track

Started by John Candy, Jan 07 2016 19:40

« previous - next »

0 Members and 0 Guests are viewing this topic.

John Candy

This thread is a continuation of the discussion from
http://g3forum.org.uk/index.php/topic,1684.msg10791.html#msg10791

The discussion relates to the lack of a G3 demo track for exhibition display.

The following quote is taken from that thread :-
QuoteThe problem was (and continues to be) finding a group of people willing to take on the commitment over a period of time - say at least three years.  However, other events seem to have overtaken us and there's no spare cash either.

So, to overcome the "shortcoming" of having no demo track, the following requirements need to be met (and I list them in order of priority for fulfilment).

a) A willing team to construct and maintain track and attend exhibitions.
b) Offer of suitable transport (precise nature dependent upon format of track).
c) Suitable storage.
d) Funding (some may argue that this should be first priority but in my view this will prove the least difficult obstacle and, in any event, the funds would be of little value if there were not the means to fulfil the project).

Here we have a G3 Forum with a large number of active Gauge 3 modellers engaged and surely we should be able to make this happen?

Not everyone will be in a position to meet all the above requirements ( "a" to "d") but if a dozen+ of us can contribute in some way, then can it not become a reality?

Personally, I am willing to make a contribution to "d" and (subject to location requirements for the  categories a, b and c ) could help in other respects.

If each G3F member were to "sponsor" an item (say a yard of track) or donate surplus materials then that would be a start.

So, what are your views on this?

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

Roy

I can only agree with John's comments; it is the members who will have to make this happen.  But I would like to emphasis from personal experience that it will require a dedicated, enthusiastic and committed team to design, construct, transport, erect and operate an exhibition layout.  Mark Pretious is very fortunate in having especially Roger Salisbury's help for transportation and storage of Blackgang, he also has a team of around six members to regularly help him and these enthusiasts spend three or four long weekends per year supporting the exhibition of this layout.

I was the organiser and keeper of our local 16mm group exhibition layout for around 6 years.  During the first 2 or 3 years there was great enthusiasm and support, we exhibited at 2 or 3 shows each year, then the interest waned, latterly it spent 2 years in my garage without being used.  In the end it was scrapped owing to a total lack of interest.  I personally bought a number of lineside buildings which I still have........

Further, when I asked for feedback about the possibility of building a permanent G3 Society layout at Guildford, I only got a handful of replies out of a membership of 260 people.

I would therefore ask members who are keen to get involved in a Society layout to contact me or the committee.  Following our year-end financial assessment, the funds are not in such a bad position as was thought earlier in the year, so we may be able to financially support such a venture if there is sufficient interest among members.

Roy Horrocks (Chairman)

IanT

One thing that should also be agreed John is the nature of any "Demonstration" track.

For instance, the G1MRA 'owned' tracks that I know of are 'running' tracks - not 'exhibition' tracks per-se. In other words they don't tend to be overly 'scenic'. The G1MRA tracks are also generally designed for continuous running (e.g. circles) - whereas all of our current (private) exhibition layouts are end-to-end.

One other comment - whatever the final nature of any proposed 'Demonstration' railway - it should be built to meet our existing modular standards. This is not an onerous requirement but does define both the height of the track work and connecting points. Everything else can be made to suit whatever other features are thought to be desirable.

On this basis by the way I would be very happy to deploy my modules as part of any 'demo' initiative. In a month or so, this will comprise 12 x 900x450 mm modules (which can also be configured as 6 x 900mmx900mm modules). Track deployment is flexible - so (for instance) I could provide 32ft of linear track (in the short term) and more (plus turnouts and other features/functionality) over time.

Depends what others have in mind of course.

My solution doesn't require Society funding but does need others Members to support it. Of course, we could have the best of both worlds. If you look at the Spur II photos, their layouts are quite a mix of detailed scenic, simple running track, dioramas and just plain 'tables' (may be work in progress of course).

Regards,

IanT

PS John - I can suggest a way for you to use your 'kits' that you may be interested in.
Nothing's ever Easy - At least the first time around.

John Candy

QuotePS John - I can suggest a way for you to use your 'kits' that you may be interested in.

Ian,

I have no plans for the four kits, so any suggestions awaited with interest!

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

IanT

You will be able to examine mine (in their new guise) at the AGM all being well John.

Regards,

IanT
Nothing's ever Easy - At least the first time around.

Roy

Ian,

To help answer to your question; the layout that always gets the most attention at the ME Exhibitions, with people watching 2 or 3 deep, is the G1MRA track, normally running live steam locomotives......

Roy

John Candy

Is that because the trains are live steam or simply because G1 is the largest scale present?

I remember when I was taken to the MRC annual exhibitions at the Westminster Central Hall in the '50's that the two most memorable layouts were those of Gauge One and the Tramway & Light Railway Society.
Both were electric  and "end-to-end" lines : The only live steam I recall from those exhibitions was a passenger-hauling track....probably 3.5 or 5 inch gauge.

I can still remember one year when the G1 layout was a terminus where  LPTB "Standard" tube stock  ran to and fro from the station into a tunnel and terminated alongside the "mainline" platforms where SR electric emus were running. The operating colour light signals were as mesmerising as the trains. Coming from LSWR and LT "Northern Line" territory I could relate to that scene.

Tastes and expectations change over time but I think that a well-built scenic line can still compete on the basis that it "relates" to a real life experience.

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.

Roy

John,

I don't think it is solely due to being live steam, but I do think live steam adds that extra interest.  G1MRA do of course run electric as well.  But I think they consistently put on a jolly good show, it is well organised, they maintain two trains running in opposite directions all the time, when one comes off, another goes on usually without a break.  And the trains are a proto-typical length.

It is not the biggest scale, as there is the Polly 5" track hauling passengers.

Roy

jamiepage

'the layout that always gets the most attention at the ME Exhibitions, with people watching 2 or 3 deep, is the G1MRA track, normally running live steam locomotives......'

All of which may be certificated, quite safely and in public, under the G1MRA scheme for small boilers....

But be that as it may, the reference to 'ME exhibitions' might suggest G3S sees the ME world as its most likely source of new members?

If so, I disagree. The far larger model railway world would be, indeed is, interested in the whole spectrum of possibilities that G3 modelling could offer them. From a single loco, coach or wagon, through 'mobile dioramas, to a scenic terminus and beyond to continuous running, any number of potential new participants could find G3 can offer something within their own particular space/ money constraints. They may even join the G3S and membership might grow.

Where does that logic lead?
Continuous 'main line' running will remain 'the pinnacle', and an organisation such as G3S should use its pooled  assets to assist its members with perhaps a test track
But such a track is not necessary to 'fly the flag' within the model railway world. Nice, but not essential.






Richard T

Quote from: Roy on Jan 08 2016 17:00
Ian,

To help answer to your question; the layout that always gets the most attention at the ME Exhibitions, with people watching 2 or 3 deep, is the G1MRA track, normally running live steam locomotives......

Roy

I think it's more a case of being the only thing moving - certainly at ME exhibition most of the exhibits are society displays or trade stands.

RT
Richard

MikeWilliams

From my youth and annual family pilgrimage to Central Hall Westminster, I too recall the G1MRA layouts.  These were usually a continuous run and the one I remember best was multi-level, live steam (sometimes controlled by 2-rail I believe), several trains moving at all times, several operators, a control tower at the top with a headphone-wearing commander controlling the show, and just fabulous.

No, I don't think we need or indeed want such a leviathan!  I do however think a continuous run with trains moving all the time is a good idea.  And I also agree that we could start simple with an end-to-end layout, even though such beasts already exist in G3 - indeed I believe two will be at the AGM.  But I think anything constructed should bear in mind the potential to extend into a continuous run at a later date.

Just my personal view.

Mike
 

IanT

My earlier comments about 'running' or 'scenic' - really apply to a Society owned track - as I think it would be up to the 'Team' to decide what sort of "Railway" they wanted to build and present/support. By it's very nature (e.g. dedicated purpose) it cannot be all things to all men.

However, this distinction clearly does not apply to a fully Modular strategy. We could exhibit either type of layout (maybe reflecting the expected audience) but why not have both?  The best of both worlds. It just depends on which (who's) modules get deployed as I assume modules will tend to reflect the interests of their builder/owners. However, Spur II is quite instructive here. They have detailed 'scenic' areas that are connected together with fairly plain track sections, just like the real thing in fact.

I also think the whole 'steam' or 'electric' question is somewhat redundant in G3 - for several reasons. The first is the widespread use of R/C control (increasingly with live steam) and the second is that 2-rail is not an issue - it's steam or battery electric (so all stock can be used - including non-insulated axles). There is also absolutely no reason why we cannot have realistic timetables operating (shunting, though trains, feeder lines etc.) given sufficient space and enough willing participants.

The sheer size of G3 is both our greatest selling point but also our biggest challenge in attracting new Members ("I like G3 but I don't have the space" ). If we can develop an affordable (& scalable) route into the G3 (particularly at a local level) then we will have a unique selling point. In my view we have to think outside the box and forget to some extent what others in different scales and gauges currently do. We are different in many ways, lets use these differences to our advantage.

Regards,

IanT
Regards,

IanT
Nothing's ever Easy - At least the first time around.

IanT

It would be quite possible to connect those two (existing) layouts together Mike - either as end-to-end or within a continuous circuit.

They would still be within the M01 definition - as they could be simply "custom" modules. I do think folk looked at the Standard and thought the track layout was limiting - but M01 is based very closely on the Spur II definitions. Mechanically I could connect my track modules to a Spur II track module - the only issue being that they are 2-rail and we are generally not.

And the Spur II guys don't seem to find their modular track system limiting in any way...   :-)

Regards,

IanT

     
Nothing's ever Easy - At least the first time around.

Geoff Nicholls

Are there actually two layouts being discussed here?  The G1MRA layout that everyone remembers from shows is a plain oval of several tracks, what we in my club describe as the test track or "roundy". Used for testing newly built trains, or giving them a chance to have a good run in, or just show them off to their best advantage.  The latter being what the G1MRA track does at shows.
The modular layout of Spur II is actually lots of little scenic sections bolted together, not necessarily meeting up again (actually meandering all over the place).
I guess the oval needs to be the produce of one team, as one project. The modular layout can begin as one module with two fiddle yards and just grow from there. The oval  will always be the same size, so you can gauge interest with exhibition managers quite easily.  Interest in the modular layout from exhibitions will depend on feedback from previous shows or the press.
The oval might be the product of a committe decision, but the modular layout needs individuals (it only takes two) working together acting as trailblazers. They just get on with it, and others will join in once it's proved successful.
Geoff.

John Candy

Geoff,

Yes, there are two proposals.
One would be a "co-operative" effort by a group of members (similar in concept to Spur 2) and the other a purely G3S effort.
Both are under discussion and it is not improbable that both could be designed around a common modular structure as proposed by Ian T (and in consequence be complementary and used in conjunction).

Regards,
John.
My fellow Members, ask not what your Society can do for you, ask what you can do for your Society.