• Welcome to The Forum for Gauge 3 Model Trains.
 
The Gauge 3 Society       2.1/2 inch Gauge Association       Cookies and privacy HOW TO JOIN: to request forum membership please click here

Gauge 3 Society members must be logged in to view the Society section
  G3 Clubroom

Welcome to the G3 Clubroom. This is the friendly online forum where members share ideas and inspiration, suggestions and advice, modelling tips, pictures and drawings, and general chat about our fine hobby of Gauge 3 railway modelling. A warm welcome, and enjoy your visit here today.

Thump... Thump... Thump...

Started by Cabbage, Jun 19 2010 18:07

« previous - next »

0 Members and 0 Guests are viewing this topic.

cabbage

Charles,

Permission was given years ago -in fact it was one of the search criteria for our "last house". My late wife said that AFTER I had built The summer house, The sun deck, The greenhouse and the downstairs "facilities" I could build my railway. Unfortunately my wife passed away on October the 17th of last year. I finished building the downstairs facilities in May.

Everyone who has looked at it has gone "OMG that is SO Sheila!!!"

On the 16th of June I ordered the wood for the track bed...

regards

ralph

cabbage

This is the section that Charles is talking about.



The hinged plate will fold back onto the sector plate. The combined length of the two is 4.8metres (surprise!). It will be moved across from one track to the other by an M10 screw mechanism (see below).



My Son and I have worked out that it would be possible to operate 3 locos with a wagon train and that the scale distance covered for the back and forth shunting would be 2.5Km. Matthew says that having the sector plate electrically cranked would be more fun. I disagree!!! I also envisage the single track sidings at the end of the layout to be converted to another two track sector plate - something that he disagrees with!!!

regards

ralph

cabbage

Charles,

Those pictures are not of my layout! You will have to ask Joe Watt what the load bearing qualities are like. As to cranking I could crank the family Austin Westminster as a teenager and I can still crank "Gertrude" MM 1,000,000 although bending down to do so is getting difficult....

On a brighter note I have nearly finished fabricating all the parts and it is down to post hole digging -which might be easier after 8cm of rain in the past week.

regards

ralph

MikeWilliams

Ralph,

Electric may sound nice, but from experience with a much smaller version in a smaller scale, hand cranking gives a lot more "feel" and easier to align the tracks exactly.  I know you can have limit switches etc but by hand you have control - and its cheaper!

How will you align the tracks - simple door bolt?

Mike

cabbage

Mike,

I was going to use a "drop bolt". This is simply a vertical length of bar that sits above a covered slot. Once the slide moves to the correct position the slot uncovers and the drop bolt falls through. Father and son are still debating signalling though. I am old fashioned and have constructed a "truth table" for reed relays whilst my son decries this and would prefer the use of a Raspberry Pi to control it.

But at the moment I am afraid that I taking more than a few paracetamol to ease the back ache. This is due to picking the fruit harvest rather than wood work!!! I had to "give in" at about 3pm this afternoon but I had picked 15 collenders worth of; Red, White, and Black currants, Jostaberries, Gooseberries, Tay and Logan berries, Cloud Berries, Boysen Berries and "Oregan Grapes".

The Beast from the East in March has cost me more than a few plants...

regards

ralph 

cabbage

The wood store is now finally empty....

The folding section has been completed and now everything awaits the posts and paint prior to cladding with the roofing felt.



This shows the "S" shaped "T" bracket that should be holding a gate. It is 300mm long but only 50mm wide. The "S" shape was hand bent in the vise using a paving brick. It is held to the folding piece with a mixture of 50mm and 75mm screws.



This shows the completed structure. The M6x100mm bolts fold into their slots and pin the structure together. There are side cheeks with ABS rubbing strips to help everything align during folding.

Now we have to return to the gardening and earthworks section of the layout. Hopefully posts and cocrete work cn commence at the weekend.

regards

ralph

cabbage

OK -it may not seem like much.... However the sector plate and folding flap have ben moved into position. This involved some "inspired" concrete work and the recycling of the plug cut out of the bathroom wall -it is cylindrical and has a 10mm hole cut through the centre!!!

So, while it all sets solid (it is "green" now) I decided to get out some track and see how it would all look.



This is the view looking from the very end of the sector plate. The tracks diverge from the folding flap end to the end of the sector plate. You can see the hinges poking up at the end of the spirit level. tomorrow more Cuprinol shopping and a roller to apply bitchumastic adhesive with -yes things are getting exciting around the cabbages.....



This shows the sliding end of the folding plate. There will be one sleeper hanging over the gap to unify the two. The crank set up is fixed to the folding flap -but is as yet unmounted to the end of the fixed trackbed  which has the set of points on it.

regards

ralph

cabbage

This should really be entitled the boys from the icky sticky black stuff!!! After having "pre-heated" my adhesive (a morning in the greenhouse)  I cleared the decks and we unrolled and chopped some lengths of roofing felt (5 in total). I dunked the brush and the ick flowed off it smoothly.... So losing no time I daubed it over the wood surface and watched for the bubbles as the solvent out gassed. We dropped the first piece of felt onto the tacky adhesive and rollered it into contract with the ick.



(Yes that is me in the hat!)

We went around all the edges with roofing clouts and then sealed the flap of the next piece to it with more ick.



And so we continued somewhat stickily along the length of the sector plate until we reached the folding piece and -well frankly we had both had enough!!!



A small "Topping Out Ceremony" was conducted with a hose pipe and all of the joints held. So we went and had lunch.

regards

ralph

cabbage

Last night after having laid 10metres of roofing felt along the drag strip -I had to play!!!! I slung down a few lengths of track and eventually there were 18 yards of track along the drag strip.... The next problem was finding any of my SLA's with any charge in them. Eventually I found 2 with enough juice left to top 11 volts between them and gleefully slung them into "No 5" the NER EF-1.

We both laughed and clapped as it grumbled along the track from one end to another at a scale speed of 30mph. This is 5mph above the speed limit. After a few out and backs I decided to go and get "Maud" the NYC "S" motor. Fitted with the same set of "dead" batteries Maud made 70mph down the drag strip. Maud need new "lucar" connectors to her SLA packs as the ones she has are too loose and can fall off when fitting the SLA's to their holders.

Today I am resting my back, getting more nails, an a large bottle of brush cleaner. This seems to be the only thing that will get the adhesive off skin (and body hair!) without too much pain...



regards

ralph

blagdon

Ralph, construction looking great, well done!  When its finished, will you be videoing some of your fascinating loco's and putting the results on 'You Tube'?

Ian the Gauge '3' Pirate

454

Ian

If at the end of that long straight the curve is 12 feet radius and if the opportunity arises there will be one visiting loco performing on that straight that I know of and that will be on Youtube.

;)

Wishing hopefully

Dave
454


cabbage

Sorry Dave....

The big curve is 3.35metre  (11 feet)  radius. The small curve at the top is 4.8metre (15 feet 8 inches) radius. So you can thunder up and down the straight but not the entire length of the track. But I think as the curves are all 1mm gauge widened you should be able to get slowly around all the curves. There are also transition straights leading into and out of each curve.  As to putting the locos on You Tube -this question has been asked before and I think the answer has to be "yes".   

This is where I shame faced have to admit that all I have in rolling stock are locos....

Building the carriages and wagons was something, "I would get around to", once the track work was laid -but in the meantime "there is this loco that I have been thinking about...."

regards

ralph

454

Don't worry Ralph we can soon fix that. The Panda can deliver.
:)

Dave
454

cabbage

Well for two days now there has been SILENCE from the construction of the railway.... I have nailed down all the track that I have built. This is both welcome and worrying!!! I have enough white metal chairs to complete the four curves required for the big 90 degree curve near the house. I think that I have enough brass rail to complete what I have to build. The "up" line to the summer house is complete. The sector plate has been populated with track, the folding flap also. Some fun and games have ensued with getting the lumps and bumps out of the track work. Yes I will confess to "tapping the track" smooth -over the 8 years that some of it has remained on the shelves of the shed it has "sagged" slightly in a few places...

As discussed with Tim and Dave -I am going to abandon the white metal chairs and wood sleepers for the Cliff Barker plastic sleeper assemblies. This will enable even my son (soon to be 14 and 6 feet 2 inches...) to help build track.

regards

ralph

cabbage

Well after having done an "audit" of the stuff in my shed I have enough white metal chairs to make 4 yards of track. I have 50 lengths of rail and several kilos of "creosoted" sleepers. I have decided to finish the big curve with the remaining chairs. But while I wait for my order -here is what it looks like.



The timbers have been painted with Cuprinol "Autumn Red" and the roofing felt stuck to the top with modern Bitumen adhesive. The original instructions in HGs book recommended red lead and hot pitch, (errrrmmm no thanks!).

The trackwork under the fruit trees has had one added benefit.... After the wind storms of yesterday I have a nice display of plums and gages to pick up without hunting for them in the grass!!!!

regards

ralph